Washington County - Southern Boulevard

Project Overview:

Washington County, MD - Southern Boulevard Project - Phase I:  Hetzer was awarded a $6.9-million dollar project to construct a new road connecting East Oak Ridge Drive to US40 Alt Rte. 40 at Funkstown, MD. The approximately 3300 LF project will use hot mix asphalt (HMA) to pave a two lane divided roadway, along with related grading, storm drainage, and stormwater management to support the future addition of two potential future lanes.  The project also consists of adding single lane roundabouts at both intersections with the connecting roads. The roundabouts will include stamped concrete truck aprons, landscaped centers, and lighting within the roundabouts and at all approaches. A concrete sidewalk will be constructed along both sides the entire length of the new roadway.  The work includes substantial earthwork, storm drain, bioretention facilities, and 14,000-TN of HMA paving.

Owner:

Washington County, MD

Dept. of Public Works

Contract Amount:

$6,950,000

Start to Completion:

March 2017 to October 2018